Project Gallery
Port Mann Bridge Upgrade
KWH took on the widening of the full length of the bridge and upgraded it to modern seismic safety standards.
Gitwinksihlkw Bridge
Due to limited accessibility, KWH utilized a temporary launch nose to erect this bridge over the Nass River.
Bellevue Access
KWH executed a tandem crane lift to erect the large curved box girders for the interchange over I-90.
Ashcroft Bridge
The new 783-foot bridge over the Thompson River was erected using a custom engineered launch system. The old bridge was dismantled piece by piece as engineered by Somerset.