Project Gallery
Car Dumper Plenum Beams
KWH successfully completed this challenging erection of all structural steel for the servicing bay.
JRI Leg Pulley
KWH replaced the head pulleys from 2 vertical conveyors at the Richardson International Terminal.
Westshore Quadrant Shiploader Recovery
KWH was the sole contractor to execute an emergency recovery of two shiploaders.
Saskatchewan Wheat Pool
KWH provides maintenance and replacement services for this waterfront grain facility.
Pacific Coast Terminals Sulfur Stack-Rack
KWH replaced various components inside the sulfur at the Pacific Coast Terminals.
Neptune Terminal Stacker/Reclaimer
KWH performed a cable change out by shoring the boom of a coal stacker/reclaimer at the Neptune Terminal.