North Mercer Island & Enatai Interceptor Upgrade-Pump Station Improvements
KWH installed new steel beams and roof decking at the new generator building and existing pump station building of the North Mercer Island Pump Station.
Mud Mountain Dam Stop Log Replacement
The Army Corps of Engineers required a crane with a higher capacity to lift the stop logs for maintenance at Mud Mountain Dam.
BNSF - Car Shop Floor Jacks - Pasco WA
KWH furnished the new Car Shop Floor Jacks at the BNSF Yard in Pasco, WA.
West Point Treatment Plant
KWH installed structural steel for the seismic upgrade of an active wastewater treatment plant.
Keenleyside Dam
KWH was awarded the seismic retrofit and construction of a new access bridge for the Keenleyside Dam.
Car Dumper Plenum Beams
KWH successfully completed this challenging erection of all structural steel for the servicing bay.
Aberfeldie Penstock
KWH decided to launch this penstock in segments uphill using purpose build rollers.
Centerm Maintenance Building
The container berths at Centerm are serviced from a new 100’ tall, all steel, structure. The main purpose of the shed is to service the RTG stacking machines that are used in storing shipping containers. The building also incorporated warehousing and office areas. KWH provided all the steel erection for the structure.
JRI Leg Pulley
KWH replaced the head pulleys from 2 vertical conveyors at the Richardson International Terminal.
Toyota Wheel Manufacturing Plant
KWH erected this steel frame building challenged by the limited space.
Westshore Quadrant Shiploader Recovery
KWH was the sole contractor to execute an emergency recovery of two shiploaders.
Saskatchewan Wheat Pool
KWH provides maintenance and replacement services for this waterfront grain facility.
CP Rail Barge
KWH installed all the steelwork for two berths at the new Canada Place terminal.
Pacific Coast Terminals Sulfur Stack-Rack
KWH replaced various components inside the sulfur at the Pacific Coast Terminals.
Port of Vancouver New Container Cranes
KWH installed three new container cranes at the Port of Vancouver.
Neptune Terminal Stacker/Reclaimer
KWH performed a cable change out by shoring the boom of a coal stacker/reclaimer at the Neptune Terminal.
Vancouver Wharves Unloader
KWH was contracted to erect new unloader as part of the storage and shipping facility’s expansion.