Project Gallery
Bollinger Canyon Road - Iron Horse Trail Bicycle and Pedestrian Overcrossing
This cable-stayed overcrossing that spans over Bollinger Canyon Road will feature multiple components installed by KWH following the erection plan designed by Somerset.
R200 Redmond Link
The new Downtown Redmond Link Extension will feature multiple staircases and decorative paneling and framing installed by KWH.
WSDOT Bainbridge Island Ferry Terminal OHL
The new overhead walkway at Bainbridge Island Ferry Terminal features four truss spans that required extensive crane placement planning due to the limited capacity of the existing pier structure.
Project Chimera
KWH procured materials and performed retrofits for the Chimera Labs building including upgrades and roof additions.
Richmond Oval
KWH erected the roof structure of the Richmond Speed Skating Oval using specialized lifting equipment.
Kicking Horse Park Bridge
High in the rugged Rocky Mountains of British Columbia, a unique bridge was built in the Kicking Horse Pass. The new bridge is just over 400 metres long at heights up to 90 meters above the canyon floor.
William R. Bennett Bridge
KWH used specialized shoring to erect this floating bridge across the Okanagan Lake.
Toyota Wheel Manufacturing Plant
KWH erected this steel frame building challenged by the limited space.