Project Gallery
West Point Treatment Plant
KWH installed structural steel for the seismic upgrade of an active wastewater treatment plant.
Keenleyside Dam
KWH was awarded the seismic retrofit and construction of a new access bridge for the Keenleyside Dam.
Aurora Bridge
KWH performed strengthening and reinforcing to increase the Aurora Bridge’s seismic resistance.
George Massey Tunnel
KWH executed the seismic retrofit of the tunnel using steel plates to strengthen the sections and joints.
Pattullo Bridge Retrofit
KWH executed various replacements and additions of members along the length of the Pattullo Bridge.
Port Mann Bridge Upgrade
KWH took on the widening of the full length of the bridge and upgraded it to modern seismic safety standards.