Project Gallery
Pattullo Bridge Retrofit
KWH executed various replacements and additions of members along the length of the Pattullo Bridge.
Westshore Quadrant Shiploader Recovery
KWH was the sole contractor to execute an emergency recovery of two shiploaders.
Saskatchewan Wheat Pool
KWH provides maintenance and replacement services for this waterfront grain facility.
Port Mann Bridge Upgrade
KWH took on the widening of the full length of the bridge and upgraded it to modern seismic safety standards.
Gitwinksihlkw Bridge
Due to limited accessibility, KWH utilized a temporary launch nose to erect this bridge over the Nass River.
Bellevue Access
KWH executed a tandem crane lift to erect the large curved box girders for the interchange over I-90.
Ashcroft Bridge
The new 783-foot bridge over the Thompson River was erected using a custom engineered launch system. The old bridge was dismantled piece by piece as engineered by Somerset.
CP Rail Barge
KWH installed all the steelwork for two berths at the new Canada Place terminal.
Pacific Coast Terminals Sulfur Stack-Rack
KWH replaced various components inside the sulfur at the Pacific Coast Terminals.
Port of Vancouver New Container Cranes
KWH installed three new container cranes at the Port of Vancouver.
Neptune Terminal Stacker/Reclaimer
KWH performed a cable change out by shoring the boom of a coal stacker/reclaimer at the Neptune Terminal.
Vancouver Wharves Unloader
KWH was contracted to erect new unloader as part of the storage and shipping facility’s expansion.