Project Gallery
William R. Bennett Bridge
KWH used specialized shoring to erect this floating bridge across the Okanagan Lake.
JRI Leg Pulley
KWH replaced the head pulleys from 2 vertical conveyors at the Richardson International Terminal.
Equatorial Guinea LNG Suspension Bridge
KWH was subcontracted to erect this suspension bridge for the LNG pipeline.
Aurora Bridge
KWH performed strengthening and reinforcing to increase the Aurora Bridge’s seismic resistance.
George Massey Tunnel
KWH executed the seismic retrofit of the tunnel using steel plates to strengthen the sections and joints.
Pattullo Bridge Retrofit
KWH executed various replacements and additions of members along the length of the Pattullo Bridge.
Westshore Quadrant Shiploader Recovery
KWH was the sole contractor to execute an emergency recovery of two shiploaders.
Port Mann Bridge Upgrade
KWH took on the widening of the full length of the bridge and upgraded it to modern seismic safety standards.
CP Rail Barge
KWH installed all the steelwork for two berths at the new Canada Place terminal.
Port of Vancouver New Container Cranes
KWH installed three new container cranes at the Port of Vancouver.