Project Gallery
Aberfeldie Penstock
KWH decided to launch this penstock in segments uphill using purpose build rollers.
Centerm Maintenance Building
The container berths at Centerm are serviced from a new 100’ tall, all steel, structure. The main purpose of the shed is to service the RTG stacking machines that are used in storing shipping containers. The building also incorporated warehousing and office areas. KWH provided all the steel erection for the structure.
Kicking Horse Park Bridge
High in the rugged Rocky Mountains of British Columbia, a unique bridge was built in the Kicking Horse Pass. The new bridge is just over 400 metres long at heights up to 90 meters above the canyon floor.
Olympic Ski Jump
The 2010 Olympic Ski Structures were erected by KWH Constructors. 14 km south of Whistler, the Whistler Nordic venue features a 95m “normal hill” and a 125m “large hill” ski jump as well as biathlon and cross country events.
William R. Bennett Bridge
KWH used specialized shoring to erect this floating bridge across the Okanagan Lake.
JRI Leg Pulley
KWH replaced the head pulleys from 2 vertical conveyors at the Richardson International Terminal.
Toyota Wheel Manufacturing Plant
KWH erected this steel frame building challenged by the limited space.
George Massey Tunnel
KWH executed the seismic retrofit of the tunnel using steel plates to strengthen the sections and joints.
Pattullo Bridge Retrofit
KWH executed various replacements and additions of members along the length of the Pattullo Bridge.
Westshore Quadrant Shiploader Recovery
KWH was the sole contractor to execute an emergency recovery of two shiploaders.
Saskatchewan Wheat Pool
KWH provides maintenance and replacement services for this waterfront grain facility.